Crude oil produced from Aera's operations in San Ardo oilfield in Monterey County, CA, requires significant heat from steam to reduce the oil's viscosity and increase overall recovery. Over time, the water cut for this production has gradually increased to 95 percent, and there are limited injection zones within the oilfield for disposal of this produced water. High reservoir pressures have resulted from reinjection of the water into Class II disposal wells within the oilfield, which in turn has resulted in reduced steam drive performance. Future oilfield development and crude oil recovery at this location may be dependent on economically dewatering the reservoir, thereby improving the steam performance.
The 1998 California Water Plan (DWR Bulletin 160-98, November 1998 edition) estimates that, at a 1995 level of development, by the year 2010 California will have a water shortage of 1.6 million acre-feet (12.4 billion barrels) in average water years and 5.1 million acre-feet (39.6 billion barrels) in drought years. The shortage forecasted for 2020 increases to 2.4 million acre-feet (18.6 billion barrels) in average water years and 6.2 million acre-feet (48.1 billion barrels) in drought years. Population growth is expected to drive the State's increased water demands.
In 2000, about 359 million barrels of produced water was reinjected into Class II disposal wells in California (California Department of Conservation, 2001). The top seven oil producing counties in California (Kern, Monterey, Santa Barbara, Los Angeles, Fresno, San Luis Obispo, and Ventura) generate 99.5% of this volume. Over 50 million barrels per year of produced water is disposed of in Class II injection wells in Monterey County, 14% of the statewide total.
Project Summary
The project tasks break out as:
- Phase I, identification of end use options and regulatory requirements: Phase I of this study identified and investigated potential end uses for the treated water. Regulatory requirements for the treatment facility and the delivery, use, and storage of the water were identified and documented.
- Phase II, pilot operation of treated water quality evaluation: The nine-month pilot operation has been completed. The results indicated that the San Ardo produced water can be treated to meet all of the water quality criteria for various end use options.
Project researchers undertook the following studies:
- Ammonia removal using a cooling tower. The raw produced water contains about 20-30 mg/l of ammonia. The Placerita Canyon pilot study identified ion exchange treatment following a high pH reverse osmosis (RO) operation as the means to remove the majority of the ammonia from the water.
- Breakpoint chlorination: As an alternative to ion exchange process to remove ammonia, bench studies were conducted to evaluate ammonia removal using breakpoint chlorination.
- Evaluation of boron removal at lower pH. The conventional approach to boron removal in oilfield produced water is by operating the RO at an elevated pH (>10.5). At this pH, boron is ionized and rejected by the RO membrane. While this approach is very effective for boron removal, this will require a large amount of chemical addition, resulting in high operations and maintenance cost.
- Oxidation of organics by chlorine dioxide to reduce membrane fouling. Under this pilot study, another novel approach is being evaluated for oxidizing complex organic matter in the raw water to minimize potential fouling of the RO membranes. Bench studies were conducted to evaluate the ability of chlorine dioxide to oxidize the complex organics to smaller entities that are less prone to fouling membranes.