Back to Top
Skip to main content
NETL Logo

FE0031603-Kickoff-2018-10-01.pdf

Membrane-Sorbent Hybrid System for Post-Combustion CO2 Capture (Contract No. DE-FE-0031603) Gökhan Alptekin Ambal Jayaraman David Gribble Michael Bonnema Project Kick-off Meeting October 1, 2018 Project Objective • Project objective is to design and construct a 1 MW scale membranesorbent hybrid post-combustion carbon capture system and evaluate its operation in a long duration field test using flue gas • Hybrid process consists of a polymeric membrane and a low temperature physical adsorbent to remove CO2 from the flue gas • Membrane is being developed by MTR • Adsorbent has been developed by TDA for post-combustion capture • Early proof-of-concept demonstrations in an SBIR Phase II/IIB project (DE-SC0011885) proved the feasibility of the hybrid system Main Project Tasks BY1 - Design of the 1 MW scale test unit - Design review - Preliminary Techno-economic analysis BY2 - Fabrication of the test unit - Site Preparation, Installation and Shakedown Tests BY3 - Field Tests (6-12 months duration) - High Fidelity Techno-economic analysis