Back to Top
Skip to main content
NETL Logo

Final_41161.pdf

CAPACITIVE TOMOGRAPHY FOR THE LOCATION OF PLASTIC PIPE FINAL TECHNICAL REPORT Principal Investigator: Brian J. Huber Project Manager: Christopher J. Ziolkowski 847-768-0549, chris.ziolkowski@gastechnology.org Report Issue Date: December 30, 2003 DOE Contract #: DE-FC26-01NT41161 Submitted by Gas Technology Institute 1700 South Mount Prospect Road Des Plaines, Illinois 60018 GTI Project Number: 61140 Submitted to NETL AAD Document Control Bldg. 921 U.S. Department of Energy National Energy Technology Laboratory P.O. Box 10940 Pittsburgh, PA 15236-0940 DOE Project Officer Anthony Zammerilli

Final_41161.pdf (1.73 MB)