Back to Top
Skip to main content
NETL Logo

41437R35.pdf

Identifying and Remediating High Water Production Problems in Basin-Centered Formations Final Report Reporting period: April 1, 2002 to September 30, 2005 Prepared by: R. L. Billingsley December 2005 DOE Award No. DE-FC26-02NT41437 Submitting Organization: Advanced Resources International, Inc. 4501 Fairfax Drive, Suite 910 Arlington, Virginia 22203-1661 Significant Subcontractors Maria Wood Henry Henry GeoConsulting Services, Inc. 863 W. Geddes Ave. Littleton, CO 80120 Keith Jagiello, Ph.D. Petro Data Integration, LLC 8770 West Eden Drive Littleton CO 80127 Leta K. Smith, Ph.D. Consultant 10154 Whiteside Lane Houston, TX 77043

41437R35.pdf (7.45 MB)