Carbon Storage R&D Project Review Meeting
August 20-22, 2013
Table of Contents
PRESENTATIONS
Tuesday, August 20, 2013
- Welcome and Introduction
Traci Rodosta, Carbon Storage Technology Manager, U.S. DOE NETL
PLENARY SESSION – KEYNOTE PRESENTATIONS
Moderator: Bruce Brown, Infrastructure Coordinator, U.S. DOE NETL
- Regional Carbon Sequestration Partnerships Overview
Bruce Brown, Infrastructure Coordinator, U.S. DOE NETL
- A Decade of CCS Development: A Global Review
John Gale, General Manager, IEA Greenhouse Gas R&D Programme
- Onshore Monitoring, Verification, Accounting, and Assessment Lessons Learned
Regional Carbon Sequestration Partnerships Panel
Lee Spangler, BSCSP; Neeraj Gupta, MRCSP; Charlie Gorecki, PCOR; George Koperna, SECARB
Moderator: Mark Ackiewicz, Director CCS Research Division, U.S. DOE Office of Fossil Energy
- Offshore Monitoring Lessons Learned: Sleipner and Snøhvit Storage Projects
Philip Ringrose, Statoil; Olav R. Hansen, Statoil; and Anne–Kari Furre, Statoil
- National Risk Assessment Program – Monitoring, Verification, Accounting, and Assessment Tools
George Guthrie, Geological and Environmental Focus Area Lead, U.S. DOE NETL
- CO2 Takes a One–Way Trip. Details at 1 p.m.
Timothy Grant, Physical Scientist, U.S. DOE NETL
Introduction to ARRA Regional Technology Training Centers Posters
PARALLEL SESSIONS
Infrastructure 1 - Brighton 1 & 2
Geologic Storage 1 - Brighton 3 & 4
MVA 1 - Haselton
Simulation/Risk Assessment 1 - Ellwood
Infrastructure 2 - Brighton 1 & 2
Geologic Storage 2 - Brighton 3 & 4
MVA 2 - Haselton
Simulation/Risk Assessment 2 - Ellwood
Wednesday, August 21, 2013
PLENARY SESSION – KEYNOTE PRESENTATIONS
Moderator: William Aljoe, Federal Project Manager, U.S. DOE NETL
Moderator: Bruce Brown, Infrastructure Coordinator, U.S. DOE NETL
PARALLEL SESSIONS
Infrastructure 3 - Brighton 1 & 2
Geologic Storage 3 - Brighton 3 & 4
MVA 3 - Haselton
Carbon Utilization 1 - Ellwood
Simulation/Risk Assessment 3 - Brighton 1 & 2
Geologic Storage 4 - Brighton 3 & 4
MVA 4 - Haselton
Carbon Utiliztion 2 - Ellwood
Thursday, August 22, 2013
PARALLEL SESSIONS
Geologic Storage 5 - Brighton 1 & 2
Geologic Storage 6 - Brighton 3 & 4
MVA 5 - Haselton
Simulation/Risk Assessment 4 - Ellwood
Geologic Storage 7 - Brighton 1 & 2
Geologic Storage 8 - Brighton 3 & 4
Simulation/Risk Assessment 5 - Haselton
Simulation/Risk Assessment 6 - Ellwood
PLENARY SESSION – KEYNOTE PRESENTATIONS
Moderator: Traci Rodosta, Carbon Storage Technology Manager, U.S. DOE NETL
NETL Conference Services Information
National Energy Technology Laboratory
Phone: (412) 386-6044 FAX: (412) 386-6486
E-mail: kimberly.yavorsky@netl.doe.gov
Disclaimer
This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government or any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.
NOTE: The papers listed above are in Portable Document Format (PDF). It is recommended to use the Adobe Acrobat Reader 7.0 or newer from Adobe Systems, Inc. to view the Proceedings.