details
Title: Updated Costs (June 2011 Basis) for Selected Bituminous Baseline Cases
Publication Number: NETL/DOE-341082312
Publication Date: 10/2012
Publication Type:
Contact: James Black
Program/Technology: Combustion
Carbon Sequestration
Gasification
Turbines
Author: Mark Woods (Booz Allen Hamilton)
Lora L. Pinkerton (WorleyParsons Group, Inc.)
Elsy Varghese (WorleyParsons Group, Inc.)
Synopsis: The Cost and Performance Baseline for Fossil Energy Power Plants, Volume 1: Bituminous Coal and Natural Gas to Electricity (Nov 2010) establishes performance and cost data for fossil energy power systems, specifically integrated gasification combined cycle (IGCC) plants fueled with bituminous coal, pulverized coal (PC) plants fueled with bituminous coal, and natural gas combined cycle (NGCC) plants all with and without carbon capture and sequestration. The cost basis for that report was June 2007. This present report updates the cost of selected cases from that report to June 2011 dollars. NOTE: Click here for additional Cost and Performance Baseline for Fossil Energy Power Plants information.
File:
<< Return